American Legion Frank Hancock Post 92
$1,390.00
70%
Goal: $2,000.00
With the leaky roof finally repaired, we would like to turn our attention to replacing the drywall that was damaged; texturing and re-painting the areas so that our building is healthy and attractive. We have Prime Rib dinners that are open to the public and don’t want our historic building to be unsightly.